TDR must for land used to widen CDP roads, says HC
TDR must for land used to widen CDP roads, says HC
CDP Bangalore Master Plan 2031, 2015
On the road to net zero, one of the main ways that companies' greenhouse gas emissions are measured and assessed is to look at them within three different '
cdp road CDP(Constituency [ roads length is km, WBM road length is km and Gravel roads length is km
cdp road gunjur The metro phase 1 and phase 2 were included in the model The peripheral ring road was included The existing network was also improved to a limited extent -
Regular
price
120.00 ₹ INR
Regular
price
120.00 ₹ INR
Sale
price
120.00 ₹ INR
Unit price
/
per